Change Order

Change Order

This Change Order sets forth any changes made to an existing contract. This change order sets out the name of the original agreement (i.e. building contract) and the parties. It also sets out a brief description of the changes to be performed and if the contractor will receive additional compensation. A written Change Order will prove invaluable in the event there are disagreements or misunderstandings between the parties.

This Change Order contains:
  • Original Contract/Parties: Title of the original contract and names of the parties;
  • Changes: Sets forth the changes made to the existing contract;
  • Cost: Additional consideration which will be paid to the contractor;
  • Signatures: Both parties must sign this change order in front of a witness.
Don't make the costly mistake of writing your own legal documents or relying on free forms available elsewhere. By using our forms you will save legal fees and feel confident knowing that these forms are prepared by attorneys and reviewed for accuracy.

This attorney-prepared packet contains:
  1. General Instructions
  2. Change Order
State Law Compliance: This form complies with the laws of all states

Form Preview   Add to cart

Add to cart

Product Specifications

Product Change Order
Pages 3
Dimensions Designed for Letter Size (8.5" x 11")
Printer compatibility Designed to print on all ink-jet and laser printers
Sample Available (requires Flash plug-in)
Editable Yes (.doc, .wpd and .rtf)
Format Microsoft Word
Adobe PDF
WordPerfect
Rich Text Format
Platform Windows Compatible
Mac Compatible
Linux Compatible
Availability In Stock. Instant Download
Usage Unlimited number of prints
Product number #28491
Download time Less than 1 minute (approx.)
Document Access Via secret online address
Email with download links
Email with attachment upon request
Refund Policy 60 days, no-questions asked, 100% money back guarantee
Support Customer support 1-800-959-5899
Online support
Additional Help


Our Promise to You:
We provide accurate, legal and secure forms. All of our forms are prepared by attorneys, can be downloaded and accessed immediately, and are backed by a 100% money back guarantee - if you are dissatisfied, in any way, you get your money back.

* According to the 2007 Altman Weil Survey of Law Firm Economics, the average attorney rate is $252.50 per hour.

$19.95

An attorney would charge
$252.5 to draft this form*

Add to cart